PAT Testing in Care Homes: What Welsh Inspectors Want to See
Run a care home and your electrical equipment list reads differently from any office's. Profiling beds and hoists. Air mattresses that must not stop overnight. Kitchen equipment working three services a day. And then the layer nobody's register quite captures: the lamps, radios, fans and phone chargers that arrive with residents and families, plug into your sockets, and become your responsibility without anyone signing anything. Here's how to keep all of it safe, and evidenced, in the way a Welsh inspection expects.
The regulatory picture, briefly and accurately
Two frameworks meet in a care home. Electrical safety comes under the Electricity at Work Regulations 1989, which require equipment to be maintained to prevent danger; the HSE's guidance is risk-based rather than a fixed annual rule. And as a regulated service in Wales you answer to Care Inspectorate Wales under the Regulated Services (Service Providers and Responsible Individuals) (Wales) Regulations 2017, which put the safety and suitability of the premises and its equipment squarely on the provider and the responsible individual. No regulation names PAT testing or an interval. What an inspection assesses is whether you're keeping people safe and can show it, and a current, itemised testing register is one of the cleanest pieces of evidence a home can produce.
Why we actually recommend tighter intervals here
Elsewhere on this blog we've argued against reflexive annual testing in low-risk offices, and we stand by it. A care home is not that environment, and the honest advice runs the other way. The risk profile is genuinely higher: equipment in continuous use, moisture and cleaning chemicals, appliances moved between rooms daily, and residents who may be unable to notice or report a damaged lead, or to get clear of a fault. When we build a schedule for a home, the hard-worked care and kitchen equipment sits on short intervals, the static and double-insulated items on longer ones, and the whole thing is written down so the reasoning is inspectable, not just the stickers.
The resident's own kit: the gap in most registers
The awkward category is the equipment you didn't buy. A resident's own television, a daughter's gift of a heater, the extension lead a family plugged in behind the wardrobe. Once it's in your building and your sockets, it's in your risk assessment whether you knew about it or not. The homes that manage this well all use the same simple policy: personal electrical items are welcomed, logged on arrival, visually checked, added to the testing register, and heaters and electric blankets get a conversation before they get a socket. It takes minutes per admission and closes the gap an inspector is most likely to find.
How we make the visit work in a home
Testing a care home isn't a job for someone who works corridor by corridor with a clipboard and no patience. Rooms are people's homes; some residents are anxious about strangers; lounges are in use all day. We work with your manager on sequencing, do the communal and kitchen areas at the quietest times, and fit bedroom visits around care routines and resident preference. Every engineer is DBS-checked as standard. Anything that fails is labelled, taken out of service and on your desk in a list the same day, with the register updated so the evidence trail is complete before we leave. There's more on how we work with care settings on our healthcare and care homes page, and on the service itself on our PAT testing page.
Get in touch
Want your next inspection to find the electrical file boringly complete? Get in touch and we'll build a schedule that fits how your home actually runs.